Code amendment omnibus
Code amendment omnibus #3
Upcoming
Open
Closed
Decision
View submissions
Submissions closed 4 June 2024
Share
Decision
We’ve decided to amend the Electricity Industry Participation Code as part of our Code amendment omnibus #3 for:
- Inflation adjustment of the prescribed maximum fees for distributed generation applications (Part 6) - effective 1 November 2024
- Expanding the registry to include more detail on the distributed generation installed at an ICP (Part 11) - effective 1 August 2025
Thank you to the submitters who provided feedback on this consultation. Your submissions informed several minor changes to the final amendments.
Decision paper
Consultation
This consultation sought feedback on two discrete amendments to the Electricity Industry Participation Code on distributed generation:
- Inflation adjustment of the prescribed maximum fees for distributed generation applications (Part 6 of the Code)
- Expanding the registry to include more detail on the distributed generation installed at an ICP (Part 11 of the Code)
Each proposal is set out in a separate section of our consultation paper, along with the associated regulatory statement. The draft Code wording is set out in the appendices.
Consultation paper
Submissions
-
Contact Energy1 page
-
Digital Stock2 pages
-
ENA3 pages
-
Horizon Networks5 pages
-
Lightyears Solar2 pages
-
Northpower2 pages
-
Orion4 pages
-
Powerco3 pages
-
Transpower3 pages
-
Unison and Centralines2 pages
-
Vector5 pages
-
WEL Networks2 pages
-
Wellington Electricity6 pages